We have the counters in as well as the dishwasher and range. The tiling is finished, the tub is functional, and the vanity lights are in. Still need to get the painting touchups done and the stove door needs replaced and both bathroom sinks need their faucets. And that’s just inside. There are also still several things to finish outside, but those can be worked on even if we’re moved in.